BOM Structure Proposal for Troycor
- James Anthony Valencia

- Jul 5, 2018
- 1 min read
Updated: Jul 10, 2018
As a process engineer, learning the process of your area, solving the issues and create a new process that will improve the overall output of the plant is fascinating. But how will you do the improvements if the root cause of the problem is too difficult to resolve.
Engineering team in Troycor (including 4 Process Engineers) study the whole process of the plant, we discuss every ideas we have, we share our knowledge we know. And in our studies, one of the root cause of the problems is the BOM Structure.

Upon conceptualizing every ideas that my teammates shared, I came out on changing the BOM structure we have. We are using SAP Business One as our System in Troycor, were structure of the BOM is very critical. One mistake might lead to redundancy of the materials or losing materials in our inventory.

Below is an example of what are the differences between the two structures. In the current structure, as you can see, it is divided into two parts; the main frame and the other parts needed to assemble the product, no matter what process it will go through it will only have two divisions. On the proposed structure, from the main product, parts are break down into several stations where the process is different from the others, this way workers will know what process will be next.

Discussion for this project ends here. For further details you can contact me at "CONTACT" tab above.
Thank you.




Comments